Recent projects

A car park, a council cycleway and a new subdivision, each with the scope and method that was used.

Night view of car park markings outside the Kincumber Mitre 10 store

Mitre 10 Kincumber

Where
Kincumber, Central Coast
Scope
Main car park and timber yard: customer parking bays, accessible spaces and designated loading areas, with directional arrows and safety markings.
Delivery
Surfaces prepared, then the work staged so key sections of the site stayed operational.
Concrete cycleway with white dashed markings running between trees

Magenta Cycleway

Where
The Entrance to Toukley, Central Coast
Scope
A 3.7 km cycleway: pedestrian and bicycle symbols to separate usage zones, plus stencilled directional arrows and signage at key entry and transition points.
Delivery
Scheduled in stages, with public access maintained during the works.
New subdivision road with a double white centre line

Huntlee subdivision

Where
Huntlee residential development, Hunter Valley
Scope
Full road line marking across a newly built road network on fresh asphalt: centre lines, edge lines and lane divisions, set out from the approved civil plans.
Method
Longitudinal markings applied with a petrol-driven line marking machine.
Delivery
Completed over two days during business hours, with no road closures or after-hours scheduling required. A returning client.

Also marked

Roads, sports courts and playgrounds

  • Roads

    Centre lines, edge lines, turning lanes, pedestrian crossings, bike lanes, arrows and speed zone markings for councils, developers and civil contractors, in waterborne paint, thermoplastic and preformed thermoplastic.

  • Sports courts and playgrounds

    Basketball, netball, tennis, volleyball and futsal courts, multi-sport layouts, and custom school playground designs, with flexible scheduling including school holidays and weekends.

Have a site like these?

Send the site type, location and rough size, or call. We come back with an estimate.

Call Request an estimate