
Property and facilities managers
Car parks
New bays, accessible and EV markings, arrows, re-marking and line removal.
- Most car parks can be marked in one day, depending on size and complexity
- After-hours and weekend work available
Central Coast and Newcastle
Recent project Mitre 10 Kincumber

Readable bays, clear walkways and a job scoped to your site. Tell us about it and we come back with an estimate.
What are you marking?

Property and facilities managers
New bays, accessible and EV markings, arrows, re-marking and line removal.

Warehouse and factory operators
Pedestrian walkways, forklift exclusion zones, loading bays and hazard zones.
Car park, cycleway and subdivision line marking.

Kincumber, Central Coast
Main car park and timber yard: customer bays, accessible spaces, loading areas and arrows.

The Entrance to Toukley, Central Coast
A 3.7 km cycleway with pedestrian and bicycle symbols, arrows and signage.

Hunter Valley
Full road line marking on a new subdivision, set out from the approved civil plans.
How an estimate works
Use the short form or call 0402 328 116. Start with the site type and location.
Where it helps, we visit to check the layout, traffic flow and safety requirements.
We come back with an estimate for the work, set out to your site.
Business hours, or after-hours and weekends where the site needs it.
Who we work for
Iconic Line Marking is a family-owned business serving the Central Coast and Newcastle since 2023, and also works across the Mid North Coast and Tamworth. It marks car parks, warehouse floors, roads, sports courts and playgrounds.
FAQ
Concrete, asphalt, bitumen and rubber, plus epoxy-coated floors. The material is chosen to suit the surface, the traffic and the durability you need.
Waterborne paint, solvent-based paint, thermoplastic and cold-applied plastic (CAP).
It varies with the material and the weather. Paint typically dries within 30 minutes to 1 hour and is ready for light use soon after. Thermoplastic is ready almost immediately.
Yes. We can work after hours, on weekends or during shutdown periods to limit disruption to your business or traffic.
From 6 months to several years, depending on traffic volume, weather exposure, maintenance and the material used.
Yes, by grinding or high-pressure water blasting. We can also re-mark or redesign the layout for better safety and flow.
Send the site type, location and rough size, or call. We come back with an estimate.